loader image

Reports

Our platform automatically generates the following reports based on EnergyPlus simulation outputs, ASHRAE standards, and LEED guidelines. These reports provide comprehensive insights to support data-driven retrofit decisions and performance verification.

 1.     Building Envelope Condition Assessment Report:
  • Purpose:

A detailed inspection of the physical condition of the building envelope.

  • Content:

◦ Assessment of roof condition (membrane, flashing, drainage)
◦ Evaluation of wall condition (cladding, insulation, air sealing)
◦ Inspection of windows and doors (frames, glazing, weather stripping)
◦ Identification of existing damage or deterioration
◦ Recommendations for repairs or replacements

Section 3-01
2.     Energy Audit Report:
  • Purpose:

Serves as the foundation for any retrofit project by assessing the building’s current energy performance and identifying areas for improvement. 

  • Content:

◦ Building description and operational characteristics
◦ Energy consumption analysis (historical utility data)
◦ On-site assessment of envelope components (walls, roof, windows, doors)
◦ Evaluation of heating, cooling, and ventilation systems
◦ Identification of energy-saving opportunities  
◦ Preliminary cost estimates for recommended retrofits

Section 3-02
3.     Cost-Benefit Analysis Report:
  • Purpose:

Evaluate the financial viability of retrofit options to support investment decisions. 

  • Content:

◦ Detailed cost estimates for proposed retrofit measures
◦ Projected energy savings and cost reductions
◦ Return on investment (ROI) calculations
◦ Payback period analysis
◦ Life-cycle cost analysis

Section 3-03
4.     Retrofit Design and Specifications Report:
  • Purpose:

Provides detailed design documentation for the implementation of selected retrofit strategies.

  • Content:

◦ Technical drawings and specifications for materials and installations
◦ Construction details and step-by-step procedures
◦ Performance criteria and compliance requirements for new components

Section 3-04
5.     Post-Retrofit Verification Report:
  • Purpose:

Ensures that retrofit measures are installed correctly and performing as intended.

  • Content:

◦ On-site inspection and verification of completed work
◦ Functional and performance testing of new systems and components
◦ Comparison of actual energy savings to projected values

Section 3-05

Drop Us a Line

We are always looking for a next great project.

Get in Touch

We appreciate every customer and are confident that our innovative solutions will create long-lasting partnerships as we grow.

info@retrofitvision.com

We are on Socials